Submission Types
Small, Medium or Large Projects all have a equal chance. It is not the scale of the project or the enabling resource base.
Innovativeness, quality, depth, completeness and impact (potential or actual) are the key issues.
# | Category of Submission | Example |
1 | Organizational, Psychological or Behavioral Theory, with implications for Information Systems Design | People or organizations behave like this….. Therefore……. an IS design should………… |
2 | Theory & Guidelines For Design of Design Constructs or Supporting Artifacts | Guidance for HOW to create or improve the design of "design artifacts" |
3 | Methods and Tools for Resource A Better Method and Allocation, Choices, and Decision Making | A better method and Allocation, Choices, and Decision Making supporting software code for allocating, choosing, deciding….. |
4 | A complete Information Support System. We designed, built and tested an for a specialized domain i.e.: Lab R&D Prototype, or Field Pilot System, or Deployed in User Setting | We designed, built and tested an information support system… in a particular domain …that supports understanding, diagnosing, matching, linking, anticipating or discovering, etc. |
5 | Other Information Systems Design & Realization Efforts | We designed, built and tested an IS system that does X…… |
6 | A Design Solution Needed for Changing, Migrating or Maintaining an Existing IS System | We design, built and tested a new method that that was needed for changing, migrating or maintaining an existing IS system. |
# | Category of Submission | 2010 | 2009 | 2008 |
1 | Organizational, Psychological or Behavioral Theory, with implications for Information Systems Design | X | X | |
2 | Theory & Guidelines For Design of Design Constructs or Supporting Artifacts | X | X | |
3 | Methods and Tools for Resource A Better Method and Allocation, Choices, and Decision Making | X | X | X |
4 | A complete Information Support System. We designed, built and tested an for a specialized domain i.e.: Lab R&D Prototype, or Field Pilot System, or Deployed in User Setting | X | X | X |
5 | Other Information Systems Design & Realization Efforts | X | X | |
6 | A Design Solution Needed for Changing, Migrating or Maintaining an Existing IS System | X | |